Completion Date: 16/02/2012

Project Location: Cairns

This project was in preparation for the installation of HV primary plant for a single pole auto reclose protection scheme at the Woree and Bayview Heights substations located in Cairns, Queensland.

Woree Substation – The scope of the works included the construction of new circuit breaker and earth switch and isolator foundations and the associated underground conduits and cable trenches as well as the construction of new bunded area and connection to existing oil separation pipes in preparation for the installation of a Neural Earthing Reactor.

Bayview Heights Substation – The scope of the works included the installation of an all weather access track, suitable for four wheel drive access to the Bayview Heights substation and the installation of underground conduits and the installation of secondary systems cabling and marshalling kiosks for the proposed current transformers.