Completion Date: 02/08/2012

Project Location: Ipswich

This project was an extension to an existing 110kV Substation at Blackstone.  The principal contractor was United Group Limited Pty Ltd and the client was Powerlink Queensland.

The scope of the works included earthworks and civil works.  The major foundations were two transformer bunded plinths suitable to accomodate 275/110kV transformers and two individual tubular strain beams.  The construction also included installation of a new oil separator tank, several smaller foundations, an extension to the existing fence, conduit, drainage, earthing, cable trench and pit system.